Monday, May 20, 2019

Laying Track

Getting the track ready for the train's arrival. Never did this before, so I'm just making it up as I go along.
Each track weighed 1,000 lbs, so I moved them with the Toyota!
Got everything leveled side to side and end to end.
 
I built this track gauge to ensure the caboose would fit on the tracks. 4 feet 8 and 1/2 inches! Pounding spikes is not in my future line of work.

Ta da!

No comments:

Post a Comment